July, 2000

(A) "Display Shell" work completed


 
16) - excavation of floor and installation air flow system for environmental control of the oak panels.   17) - encasing the 2-foot diameter ducts in concrete
     
 
18) - pouring the concrete support floor   19) - installing the wood sub-floor
* completion of display shell interior (the exterior will be another, later project)

To July, 2000 (B) - Moving the Original Room Contents to the display shell