December 2000
![]() |
![]() |
|
(97) Cleaning the hundreds of pieces of glass in the original light fixtures |
(98) Mounting the glass fixtures on the chandeliers |
|
![]() |
![]() |
|
| (99) A completed skylight at the top of the arched ceiling | (100) The Royal Alexandra Hall with most parts mounted and awaiting installation of the cove moulding and final varnishing of the ceiling beamwork. | |
(B) Fireplace Restoration Begins
![]() |
![]() |
|
| (101) Parts of the fireplace being stripped of paint exposing the original varnished oak | (102) One of the long front columns being stripped | |
![]() |
||
| (103) A detail of the bottom of one of the columns being stripped |
To some photos showing the general state of the project at the end of 2000.