January 2001
(A) Main Entrance Hall Framing Begins
![]() |
![]() |
|
| (104) Front walls being erected - Royal Alexandra Hall on left & Freight Shed in distance | (105) View of main hall construction from distance showing how it connects the Royal Alexandra (left) to the Freight Shed (right) |
|
![]() |
![]() |
|
| (106) High trusses being mounted on top of the 3-storey walls | (107) Interior view to north in main entrance hall showing future display location of 17 foot-high carved oak fireplace- on central axis of main doors | |
![]() |
![]() |
|
(108) View to south-west under mezzanine and along the location of the future reception hall containing 5 french door (openings) of the Royal Alexandra Hall. |
(109) View of main front with building wrap applied. |